Skip to main content

#job-costing

Job Costing

Track costs per project or job for accurate profitability analysis

Surety Bonds for Construction Contractors: How the Miller Act and SBA Guarantee Program Open Public Works to Small Builders

Public construction contracts above the FAR $150,000 threshold require performance and payment bonds under the Miller Act, with state Little Miller Acts setting thresholds from $25,000 to $500,000. The SBA Surety Bond Guarantee Program—which guaranteed $10.6 billion in bonds for 2,200+ small businesses in FY2025—lets approved sureties write bonds for small contractors by absorbing 80–90% of loss risk.

AIA Pay Applications, Retainage, and WIP Schedules: How Construction Billing Ties to GAAP Revenue Recognition

AIA G702 and G703 pay applications, schedules of values, retainage, WIP schedules, and over/underbilling reconciliations are what tie construction billing to GAAP revenue recognition under ASC 606. Here is how each piece works, why a $312 line error can delay a $1.4M wire by 41 days, and the patterns that rattle sureties.

Percentage of Completion vs Completed Contract: A Contractor's Guide to Construction Revenue Recognition

A side-by-side comparison of the Percentage of Completion (PCM) and Completed Contract (CCM) methods for construction revenue recognition, with worked examples, ASC 606 over-time criteria, the IRC Section 460 small contractor exception (~$31M for 2026), WIP schedule mechanics, and the overbilling/underbilling traps that wreck contractor cash flow.