Към основното съдържание

#contracts

Contracts

Client contracts, scope of work agreements, and legal documentation for service businesses

The SBA 8(a) Program in 2026: A Survival Guide to Federal Set-Asides After the Ultima Reset

A practical guide to qualifying for the SBA 8(a) Business Development Program in 2026 — the $850,000 personal net worth, $400,000 three-year average AGI, and $6.5 million asset caps, the post-Ultima social disadvantage standard, $7M and $4.5M sole-source thresholds, and how to survive the nine-year graduation clock without losing certification.

Surety Bonds for Construction Contractors: Miller Act, SBA Guarantees, and the Books That Build Bonding Capacity

How bid, performance, and payment bonds work in 2026 for small construction contractors — the Miller Act's $35K and $150K federal thresholds, the SBA's 80–90% guarantee covering contracts up to $14 million, and the working-capital and WIP discipline that decides which builders get bonded for the largest jobs.

Surety Bonds for Construction Contractors: How the Miller Act and SBA Guarantee Program Open Public Works to Small Builders

Public construction contracts above the FAR $150,000 threshold require performance and payment bonds under the Miller Act, with state Little Miller Acts setting thresholds from $25,000 to $500,000. The SBA Surety Bond Guarantee Program—which guaranteed $10.6 billion in bonds for 2,200+ small businesses in FY2025—lets approved sureties write bonds for small contractors by absorbing 80–90% of loss risk.

AIA Pay Applications, Retainage, and WIP Schedules: How Construction Billing Ties to GAAP Revenue Recognition

AIA G702 and G703 pay applications, schedules of values, retainage, WIP schedules, and over/underbilling reconciliations are what tie construction billing to GAAP revenue recognition under ASC 606. Here is how each piece works, why a $312 line error can delay a $1.4M wire by 41 days, and the patterns that rattle sureties.

DCAA Audit Compliance for Government Contractors: SF 1408, Timekeeping, and Incurred Cost Submissions

A practical guide to the three audits every cost-reimbursable federal contractor faces — the SF 1408 pre-award accounting system survey, daily timekeeping compliance, and the Incurred Cost Submission due six months after fiscal year-end — with a 90-day preparation plan and the five most common audit findings.

Earnouts in M&A: Bridging the Valuation Gap Without Walking Into a Lawsuit

About one third of 2024 private-target M&A deals included an earnout, and median earnout potential rose to roughly 43% of the closing payment. This guide explains contingent purchase price structure, Section 453 installment-sale tax mechanics, the compensation-versus-purchase-price trap, and the recurring drafting mistakes behind six of the last seven major Delaware decisions favoring sellers.

FTC Non-Compete Rule Withdrawn: How Employers Should Adapt to the State-by-State Patchwork in 2026

On February 12, 2026, the FTC removed its 2024 non-compete ban from the Code of Federal Regulations, but pivoted to case-by-case Section 5 enforcement and consent orders against employers like Rollins. With California, Colorado, Illinois, Minnesota, and other states tightening their own rules, a single national non-compete template is now a compliance hazard. This guide maps the state landscape and lays out a five-step plan for employers.

Percentage of Completion vs Completed Contract: A Contractor's Guide to Construction Revenue Recognition

A side-by-side comparison of the Percentage of Completion (PCM) and Completed Contract (CCM) methods for construction revenue recognition, with worked examples, ASC 606 over-time criteria, the IRC Section 460 small contractor exception (~$31M for 2026), WIP schedule mechanics, and the overbilling/underbilling traps that wreck contractor cash flow.