#job-costing
Job Costing
Track costs per project or job for accurate profitability analysis
Surety Bonds for Construction Contractors: Miller Act, SBA Guarantees, and the Books That Build Bonding Capacity
How bid, performance, and payment bonds work in 2026 for small construction contractors — the Miller Act's $35K and $150K federal thresholds, the SBA's 80–90% guarantee covering contracts up to $14 million, and the working-capital and WIP discipline that decides which builders get bonded for the largest jobs.
Surety Bonds for Construction Contractors: How the Miller Act and SBA Guarantee Program Open Public Works to Small Builders
Public construction contracts above the FAR $150,000 threshold require performance and payment bonds under the Miller Act, with state Little Miller Acts setting thresholds from $25,000 to $500,000. The SBA Surety Bond Guarantee Program—which guaranteed $10.6 billion in bonds for 2,200+ small businesses in FY2025—lets approved sureties write bonds for small contractors by absorbing 80–90% of loss risk.
AIA Pay Applications, Retainage, and WIP Schedules: How Construction Billing Ties to GAAP Revenue Recognition
AIA G702 and G703 pay applications, schedules of values, retainage, WIP schedules, and over/underbilling reconciliations are what tie construction billing to GAAP revenue recognition under ASC 606. Here is how each piece works, why a $312 line error can delay a $1.4M wire by 41 days, and the patterns that rattle sureties.
DCAA Audit Compliance for Government Contractors: SF 1408, Timekeeping, and Incurred Cost Submissions
A practical guide to the three audits every cost-reimbursable federal contractor faces — the SF 1408 pre-award accounting system survey, daily timekeeping compliance, and the Incurred Cost Submission due six months after fiscal year-end — with a 90-day preparation plan and the five most common audit findings.
Percentage of Completion vs Completed Contract: A Contractor's Guide to Construction Revenue Recognition
A side-by-side comparison of the Percentage of Completion (PCM) and Completed Contract (CCM) methods for construction revenue recognition, with worked examples, ASC 606 over-time criteria, the IRC Section 460 small contractor exception (~$31M for 2026), WIP schedule mechanics, and the overbilling/underbilling traps that wreck contractor cash flow.
Construction Accounting: A Complete Guide for Contractors and Small Builders
Learn the essentials of construction accounting including job costing, revenue recognition methods, WIP schedules, retainage tracking, and change order management. A practical guide for contractors and small builders.