#job-costing
Job Costing
Track costs per project or job for accurate profitability analysis
Granite, Quartz, and Natural Stone Fabricator Bookkeeping: Slab Inventory, CNC Burden, and Builder-vs-Retail Margins
A practical bookkeeping guide for granite and quartz countertop shops — slab-level inventory by bundle number, machine-hour burden rates for bridge saws and CNCs, ASC 606 over-time revenue recognition, channel-separated builder versus retail P&L, and warranty reserves that hold up under audit.
Painting Contractor Bookkeeping: How Residential and Commercial Painters Bid, Job-Cost, and Stay Profitable Without Bleeding Margin on Callbacks
Painting contractors lose margin in three places — unmeasured prep hours, a wrong burdened labor rate, and unreserved callbacks. This guide shows the chart of accounts, EPA RRP cost treatment, warranty reserve journal entries, and lender-grade KPIs that keep residential and commercial painters profitable.
Mobile Mechanic Bookkeeping: Premium Billing, Section 179, Markup Matrix, and Warranty Reserves
A working playbook for mobile mechanic bookkeeping — tiered labor rates, a parts markup matrix targeting 58% gross margin, actual-expense vs 72.5-cent standard mileage, Section 179 on scan tools and upfitted cargo vans, comeback warranty reserves, and quarterly Schedule C obligations.
Commercial Print Shop Bookkeeping: Press Hour Rate, ASC 606, and KPIs That Catch Margin Leaks
A practical guide to commercial print and sign shop bookkeeping — calculating a loaded press hour rate, applying ASC 606 over-time recognition for customer-specific goods, tracking paper and ink spoilage with reserves, stacking Section 179 with 100 percent bonus depreciation on press equipment, and watching KPIs like press uptime and makeready waste that catch margin leaks before they reach the P&L.
Roofing Contractor Bookkeeping for Storm Restoration: ACV, RCV, Mortgage-Endorsed Checks, Supplements, and Warranty Reserves
A working guide to bookkeeping for storm-restoration roofers — splitting insurance and retail revenue, tracking ACV and recoverable-depreciation receivables, modeling mortgage-endorsement float, booking supplements as scope adjustments rather than new sales, accruing 1–3 percent workmanship warranty reserves, and applying Section 179 to trucks, dumpsters, and tear-off equipment.
AIA-Style Progress Billing With Forms G702 and G703: A Contractor's Guide to Schedule of Values, Retainage, Change Orders, and ASC 606
How AIA Forms G702 and G703 work together, how to build a defensible schedule of values, handle retainage and change orders on the continuation sheet, and reconcile progress billings to ASC 606 revenue recognition for U.S. general contractors.
Commercial Drone Photography Bookkeeping: Part 107, Section 179, Battery Cycles, and Stock Footage Royalties
How to set up books for a Part 107 commercial drone business — separate revenue lines by service type, capitalize airframes and payloads as distinct assets, track per-flight battery cycles as cost of service, and apply the 2025 permanent 100% bonus depreciation under OBBBA.
Tree Service Bookkeeping: Cost-Per-Hour, Workers' Comp Class 0106, Section 179, and Seasonal Cash Flow
How tree care companies should structure their books — separating workers' comp class 0106 payroll, allocating bucket truck and chipper hours per job, reserving for e-mod surges, and pricing crews off a true burdened cost-per-hour rate.
Bookkeeping for Local and Long-Distance Moving Companies: Carriers, Brokers, Fuel Surcharges, and Driver Settlements
Build a chart of accounts that separates carrier revenue from broker pass-throughs, handles fuel surcharges and packing inventory correctly, and reconciles driver settlements against bills of lading — the bookkeeping discipline that protects margin in local and long-distance moving operations.
How to Read a Construction WIP Schedule: Percentage-of-Completion, Over- and Under-Billing
A construction WIP schedule recognizes revenue as work is performed using cost-to-cost percentage-of-completion, then exposes over- and under-billing on every job — the report banks and surety underwriters read before the income statement.
Job Costing for Contractors: Labor Burden, Cost Codes, and Committed Costs
Job costing assigns every dollar of cost to the job that caused it. Fully burdened labor runs 30 to 50 percent above base wage, overhead is applied with a predetermined rate, and committed costs reveal a budget overrun before the invoices arrive — read the variance column weekly.
The Construction WIP Schedule: Percentage-of-Completion Accounting Under ASC 606
How construction contractors use the work-in-progress schedule and ASC 606 percentage-of-completion accounting to surface overbillings, underbillings, profit fade, and the financial signals sureties and banks actually read.