#cash-flow
Cash Flow
Track and optimize cash flow for better financial health and stability
Laundromat Bookkeeping: Coin, Card, and Mobile-Pay Reconciliation, Utility COGS, and Section 179
A bookkeeping framework for coin-op and wash-dry-fold laundromats — channel-separated revenue, utilities tracked as COGS, per-machine profitability, Section 179 timing on equipment refreshes, and cash controls that surface both theft and failing machines.
Roofing Contractor Bookkeeping for Storm Restoration: ACV, RCV, Mortgage-Endorsed Checks, Supplements, and Warranty Reserves
A working guide to bookkeeping for storm-restoration roofers — splitting insurance and retail revenue, tracking ACV and recoverable-depreciation receivables, modeling mortgage-endorsement float, booking supplements as scope adjustments rather than new sales, accruing 1–3 percent workmanship warranty reserves, and applying Section 179 to trucks, dumpsters, and tear-off equipment.
AIA-Style Progress Billing With Forms G702 and G703: A Contractor's Guide to Schedule of Values, Retainage, Change Orders, and ASC 606
How AIA Forms G702 and G703 work together, how to build a defensible schedule of values, handle retainage and change orders on the continuation sheet, and reconcile progress billings to ASC 606 revenue recognition for U.S. general contractors.
Tree Service Bookkeeping: Cost-Per-Hour, Workers' Comp Class 0106, Section 179, and Seasonal Cash Flow
How tree care companies should structure their books — separating workers' comp class 0106 payroll, allocating bucket truck and chipper hours per job, reserving for e-mod surges, and pricing crews off a true burdened cost-per-hour rate.
Tribal Gaming and Casino Accounting Under NIGC MICS: Win, Drop, Hold, and the Internal Controls That Keep a Sovereign Casino Auditable
How tribal casinos account for win, drop, and hold under NIGC Minimum Internal Control Standards — covering Class II and Class III chart-of-accounts design, cage and vault key control, Title 31 Form 8362 CTR filing, IGRA per-capita withholding under IRC Section 3402(r), and the annual Agreed-Upon Procedures engagement that ties surveillance to the ledger.
Why Profitable Businesses Run Out of Cash: The Cash Conversion Cycle, Explained
A worked guide to the cash conversion cycle and the three working-capital levers — DIO, DSO, and DPO — with industry benchmarks, the Amazon and Dell negative-CCC playbook, and the bookkeeping foundation small businesses need to shorten the gap.
The Cash Conversion Cycle: How Small Businesses Free Cash Trapped in Operations
A practical walkthrough of the cash conversion cycle (DIO + DSO − DPO) for small businesses — how to calculate each component, what counts as a healthy CCC by industry, and the order to pull the three levers that free trapped working capital without breaking supplier or customer relationships.
Staffing Agency Accounting: Bill Rate, Burden, and the Payroll-to-Payment Gap
How staffing agencies should price bill rates above fully burdened pay rates, read gross margin by placement type, and book invoice factoring without hiding the spread. Includes burden components (FICA, FUTA, SUTA, workers' comp), a placement-aware chart of accounts, and the DSO math behind payroll funding gaps.
Bookkeeping for Food Truck Owners: Cash Sales, COGS, and Sales Tax
A step-by-step bookkeeping system for food trucks — separating business money, building a truck-specific chart of accounts, running a daily cash close, tracking food cost at 25–30% of revenue, and treating collected sales tax as a liability rather than income.
Bookkeeping for Landscaping & Lawn Care: Job Costing, Seasonal Cash Flow, and Crew Labor
Landscaping books need four things a generic ledger lacks — job costing, seasonal cash flow forecasting, burdened crew labor, and a service-line chart of accounts. This guide shows how to set up each so your numbers reveal which work earns margin and how much cash bridges the off-season.
Building a Three-Statement Financial Model: Linking Income, Balance Sheet, and Cash Flow
A three-statement financial model links the income statement, balance sheet, and cash flow statement so one set of assumptions flows through all three — answering whether a business is profitable and when it runs out of cash. This guide covers the seven-step build order, the three links that make the model balance, and the errors that quietly break it.
How to Read a Construction WIP Schedule: Percentage-of-Completion, Over- and Under-Billing
A construction WIP schedule recognizes revenue as work is performed using cost-to-cost percentage-of-completion, then exposes over- and under-billing on every job — the report banks and surety underwriters read before the income statement.