Skip to main content

#cash-flow

Cash Flow

Track and optimize cash flow for better financial health and stability

334 postsView all tags
Laundromat Bookkeeping: Coin, Card, and Mobile-Pay Reconciliation, Utility COGS, and Section 179
·mike

Laundromat Bookkeeping: Coin, Card, and Mobile-Pay Reconciliation, Utility COGS, and Section 179

A bookkeeping framework for coin-op and wash-dry-fold laundromats — channel-separated revenue, utilities tracked as COGS, per-machine profitability, Section 179 timing on equipment refreshes, and cash controls that surface both theft and failing machines.

bookkeeping
small-business
cash-flow
Roofing Contractor Bookkeeping for Storm Restoration: ACV, RCV, Mortgage-Endorsed Checks, Supplements, and Warranty Reserves
·mike

Roofing Contractor Bookkeeping for Storm Restoration: ACV, RCV, Mortgage-Endorsed Checks, Supplements, and Warranty Reserves

A working guide to bookkeeping for storm-restoration roofers — splitting insurance and retail revenue, tracking ACV and recoverable-depreciation receivables, modeling mortgage-endorsement float, booking supplements as scope adjustments rather than new sales, accruing 1–3 percent workmanship warranty reserves, and applying Section 179 to trucks, dumpsters, and tear-off equipment.

construction
job-costing
bookkeeping
AIA-Style Progress Billing With Forms G702 and G703: A Contractor's Guide to Schedule of Values, Retainage, Change Orders, and ASC 606
·mike

AIA-Style Progress Billing With Forms G702 and G703: A Contractor's Guide to Schedule of Values, Retainage, Change Orders, and ASC 606

How AIA Forms G702 and G703 work together, how to build a defensible schedule of values, handle retainage and change orders on the continuation sheet, and reconcile progress billings to ASC 606 revenue recognition for U.S. general contractors.

construction
job-costing
revenue-recognition
Tree Service Bookkeeping: Cost-Per-Hour, Workers' Comp Class 0106, Section 179, and Seasonal Cash Flow
·mike

Tree Service Bookkeeping: Cost-Per-Hour, Workers' Comp Class 0106, Section 179, and Seasonal Cash Flow

How tree care companies should structure their books — separating workers' comp class 0106 payroll, allocating bucket truck and chipper hours per job, reserving for e-mod surges, and pricing crews off a true burdened cost-per-hour rate.

bookkeeping
job-costing
trades
Tribal Gaming and Casino Accounting Under NIGC MICS: Win, Drop, Hold, and the Internal Controls That Keep a Sovereign Casino Auditable
·mike

Tribal Gaming and Casino Accounting Under NIGC MICS: Win, Drop, Hold, and the Internal Controls That Keep a Sovereign Casino Auditable

How tribal casinos account for win, drop, and hold under NIGC Minimum Internal Control Standards — covering Class II and Class III chart-of-accounts design, cage and vault key control, Title 31 Form 8362 CTR filing, IGRA per-capita withholding under IRC Section 3402(r), and the annual Agreed-Upon Procedures engagement that ties surveillance to the ledger.

accounting
internal-controls
compliance
Why Profitable Businesses Run Out of Cash: The Cash Conversion Cycle, Explained
·mike

Why Profitable Businesses Run Out of Cash: The Cash Conversion Cycle, Explained

A worked guide to the cash conversion cycle and the three working-capital levers — DIO, DSO, and DPO — with industry benchmarks, the Amazon and Dell negative-CCC playbook, and the bookkeeping foundation small businesses need to shorten the gap.

cash-flow
working-capital
small-business
The Cash Conversion Cycle: How Small Businesses Free Cash Trapped in Operations
·mike

The Cash Conversion Cycle: How Small Businesses Free Cash Trapped in Operations

A practical walkthrough of the cash conversion cycle (DIO + DSO − DPO) for small businesses — how to calculate each component, what counts as a healthy CCC by industry, and the order to pull the three levers that free trapped working capital without breaking supplier or customer relationships.

working-capital
cash-flow
small-business
Staffing Agency Accounting: Bill Rate, Burden, and the Payroll-to-Payment Gap
·mike

Staffing Agency Accounting: Bill Rate, Burden, and the Payroll-to-Payment Gap

How staffing agencies should price bill rates above fully burdened pay rates, read gross margin by placement type, and book invoice factoring without hiding the spread. Includes burden components (FICA, FUTA, SUTA, workers' comp), a placement-aware chart of accounts, and the DSO math behind payroll funding gaps.

bookkeeping
small-business
payroll
Bookkeeping for Food Truck Owners: Cash Sales, COGS, and Sales Tax
·mike

Bookkeeping for Food Truck Owners: Cash Sales, COGS, and Sales Tax

A step-by-step bookkeeping system for food trucks — separating business money, building a truck-specific chart of accounts, running a daily cash close, tracking food cost at 25–30% of revenue, and treating collected sales tax as a liability rather than income.

bookkeeping
small-business
cost-of-goods-sold
Bookkeeping for Landscaping & Lawn Care: Job Costing, Seasonal Cash Flow, and Crew Labor
·mike

Bookkeeping for Landscaping & Lawn Care: Job Costing, Seasonal Cash Flow, and Crew Labor

Landscaping books need four things a generic ledger lacks — job costing, seasonal cash flow forecasting, burdened crew labor, and a service-line chart of accounts. This guide shows how to set up each so your numbers reveal which work earns margin and how much cash bridges the off-season.

bookkeeping
seasonal-business
cash-flow
Building a Three-Statement Financial Model: Linking Income, Balance Sheet, and Cash Flow
·mike

Building a Three-Statement Financial Model: Linking Income, Balance Sheet, and Cash Flow

A three-statement financial model links the income statement, balance sheet, and cash flow statement so one set of assumptions flows through all three — answering whether a business is profitable and when it runs out of cash. This guide covers the seven-step build order, the three links that make the model balance, and the errors that quietly break it.

financial-statements
income-statement
forecasting
How to Read a Construction WIP Schedule: Percentage-of-Completion, Over- and Under-Billing
·mike

How to Read a Construction WIP Schedule: Percentage-of-Completion, Over- and Under-Billing

A construction WIP schedule recognizes revenue as work is performed using cost-to-cost percentage-of-completion, then exposes over- and under-billing on every job — the report banks and surety underwriters read before the income statement.

construction
job-costing
revenue-recognition
Showing 193–204 of 334 posts
Prev17 / 28Next