Salta al contenuto principale

#construction

Construction

Accounting practices for construction businesses including job costing, WIP schedules, and retainage

Custom Cabinet and Millwork Shop Bookkeeping: ASC 606, Job Costing, and Section 179
·mike

Custom Cabinet and Millwork Shop Bookkeeping: ASC 606, Job Costing, and Section 179

How custom cabinet and architectural millwork shops should account for long-lead contracts under ASC 606, allocate CNC machine-hour burden, hold customer deposits as liabilities, reserve for hardwood yield loss, and expense equipment under the 2026 Section 179 limit of $2.56M.

bookkeeping
manufacturing
job-costing
Roofing Contractor Bookkeeping for Storm Restoration: ACV, RCV, Mortgage-Endorsed Checks, Supplements, and Warranty Reserves
·mike

Roofing Contractor Bookkeeping for Storm Restoration: ACV, RCV, Mortgage-Endorsed Checks, Supplements, and Warranty Reserves

A working guide to bookkeeping for storm-restoration roofers — splitting insurance and retail revenue, tracking ACV and recoverable-depreciation receivables, modeling mortgage-endorsement float, booking supplements as scope adjustments rather than new sales, accruing 1–3 percent workmanship warranty reserves, and applying Section 179 to trucks, dumpsters, and tear-off equipment.

construction
job-costing
bookkeeping
AIA-Style Progress Billing With Forms G702 and G703: A Contractor's Guide to Schedule of Values, Retainage, Change Orders, and ASC 606
·mike

AIA-Style Progress Billing With Forms G702 and G703: A Contractor's Guide to Schedule of Values, Retainage, Change Orders, and ASC 606

How AIA Forms G702 and G703 work together, how to build a defensible schedule of values, handle retainage and change orders on the continuation sheet, and reconcile progress billings to ASC 606 revenue recognition for U.S. general contractors.

construction
job-costing
revenue-recognition
Markup vs. Margin: The Pricing Mistake That Quietly Costs Small Businesses 7 Points of Profit on Every Sale
·mike

Markup vs. Margin: The Pricing Mistake That Quietly Costs Small Businesses 7 Points of Profit on Every Sale

Markup and margin share a numerator but not a denominator, and the gap can quietly cost a contractor $99,000 a year. A plain-language guide to the conversion math, a target-margin lookup table, and why retailers, contractors, and restaurants keep underpricing jobs.

pricing-strategies
profit-margins
small-business
Solar Installation Contractor Accounting: Customer Deposits, RECs, PPAs, and Passing Through the Section 48 ITC Without Triggering Recapture
·mike

Solar Installation Contractor Accounting: Customer Deposits, RECs, PPAs, and Passing Through the Section 48 ITC Without Triggering Recapture

A solar installer's bookkeeping playbook — customer deposits under ASC 606, REC inventory, PPA classification under ASC 842, the 50% basis reduction on the Section 48 ITC, Section 6418 transferability mechanics, and the five-year recapture clock that survives a sale of the business.

construction
bookkeeping
tax-credits
Section 45L Before the Lights Go Out: How Builders and Developers Can Still Claim $2,500 to $5,000 Per Unit Before June 30, 2026
·mike

Section 45L Before the Lights Go Out: How Builders and Developers Can Still Claim $2,500 to $5,000 Per Unit Before June 30, 2026

Section 45L pays builders and developers $500 to $5,000 per energy-efficient home, but the One Big Beautiful Bill Act ends the credit for homes acquired after June 30, 2026. A practical guide to ENERGY STAR versus Zero Energy Ready certification, prevailing wage rules on multifamily, the LIHTC basis carve-out, and the Form 8908 mechanics that decide whether the credit survives audit.

tax-credits
tax-compliance
construction
How to Read a Construction WIP Schedule: Percentage-of-Completion, Over- and Under-Billing
·mike

How to Read a Construction WIP Schedule: Percentage-of-Completion, Over- and Under-Billing

A construction WIP schedule recognizes revenue as work is performed using cost-to-cost percentage-of-completion, then exposes over- and under-billing on every job — the report banks and surety underwriters read before the income statement.

construction
job-costing
revenue-recognition
Job Costing for Contractors: Labor Burden, Cost Codes, and Committed Costs
·mike

Job Costing for Contractors: Labor Burden, Cost Codes, and Committed Costs

Job costing assigns every dollar of cost to the job that caused it. Fully burdened labor runs 30 to 50 percent above base wage, overhead is applied with a predetermined rate, and committed costs reveal a budget overrun before the invoices arrive — read the variance column weekly.

job-costing
construction
trades
Surviving the Workers' Comp Premium Audit: A Small Employer's Field Guide to NCCI Class Codes, Officer Elections, Overtime Carve-Outs, and Subcontractor Traps
·mike

Surviving the Workers' Comp Premium Audit: A Small Employer's Field Guide to NCCI Class Codes, Officer Elections, Overtime Carve-Outs, and Subcontractor Traps

Workers' compensation premium is recalculated every year using your actual payroll, and unprepared small employers routinely owe five-figure true-ups. This guide walks through the NCCI premium formula, the standard exception rules, the overtime carve-out math, owner and officer exclusion forms, the subcontractor COI rules that trigger the largest audit hits, and how to dispute a Final Audit Statement.

small-business
audit
payroll
The Construction WIP Schedule: Percentage-of-Completion Accounting Under ASC 606
·mike

The Construction WIP Schedule: Percentage-of-Completion Accounting Under ASC 606

How construction contractors use the work-in-progress schedule and ASC 606 percentage-of-completion accounting to surface overbillings, underbillings, profit fade, and the financial signals sureties and banks actually read.

construction
job-costing
revenue-recognition
Surety Bonds for Construction Contractors: Miller Act, SBA Guarantees, and the Books That Build Bonding Capacity
·mike

Surety Bonds for Construction Contractors: Miller Act, SBA Guarantees, and the Books That Build Bonding Capacity

How bid, performance, and payment bonds work in 2026 for small construction contractors — the Miller Act's $35K and $150K federal thresholds, the SBA's 80–90% guarantee covering contracts up to $14 million, and the working-capital and WIP discipline that decides which builders get bonded for the largest jobs.

construction
sba
small-business
Surety Bonds for Construction Contractors: How the Miller Act and SBA Guarantee Program Open Public Works to Small Builders
·mike

Surety Bonds for Construction Contractors: How the Miller Act and SBA Guarantee Program Open Public Works to Small Builders

Public construction contracts above the FAR $150,000 threshold require performance and payment bonds under the Miller Act, with state Little Miller Acts setting thresholds from $25,000 to $500,000. The SBA Surety Bond Guarantee Program—which guaranteed $10.6 billion in bonds for 2,200+ small businesses in FY2025—lets approved sureties write bonds for small contractors by absorbing 80–90% of loss risk.

construction
sba
small-business
Mostrando 13–24 di 30 articoli