#construction
Construction
Accounting practices for construction businesses including job costing, WIP schedules, and retainage
Custom Cabinet and Millwork Shop Bookkeeping: ASC 606, Job Costing, and Section 179
How custom cabinet and architectural millwork shops should account for long-lead contracts under ASC 606, allocate CNC machine-hour burden, hold customer deposits as liabilities, reserve for hardwood yield loss, and expense equipment under the 2026 Section 179 limit of $2.56M.
Roofing Contractor Bookkeeping for Storm Restoration: ACV, RCV, Mortgage-Endorsed Checks, Supplements, and Warranty Reserves
A working guide to bookkeeping for storm-restoration roofers — splitting insurance and retail revenue, tracking ACV and recoverable-depreciation receivables, modeling mortgage-endorsement float, booking supplements as scope adjustments rather than new sales, accruing 1–3 percent workmanship warranty reserves, and applying Section 179 to trucks, dumpsters, and tear-off equipment.
AIA-Style Progress Billing With Forms G702 and G703: A Contractor's Guide to Schedule of Values, Retainage, Change Orders, and ASC 606
How AIA Forms G702 and G703 work together, how to build a defensible schedule of values, handle retainage and change orders on the continuation sheet, and reconcile progress billings to ASC 606 revenue recognition for U.S. general contractors.
Markup vs. Margin: The Pricing Mistake That Quietly Costs Small Businesses 7 Points of Profit on Every Sale
Markup and margin share a numerator but not a denominator, and the gap can quietly cost a contractor $99,000 a year. A plain-language guide to the conversion math, a target-margin lookup table, and why retailers, contractors, and restaurants keep underpricing jobs.
Solar Installation Contractor Accounting: Customer Deposits, RECs, PPAs, and Passing Through the Section 48 ITC Without Triggering Recapture
A solar installer's bookkeeping playbook — customer deposits under ASC 606, REC inventory, PPA classification under ASC 842, the 50% basis reduction on the Section 48 ITC, Section 6418 transferability mechanics, and the five-year recapture clock that survives a sale of the business.
Section 45L Before the Lights Go Out: How Builders and Developers Can Still Claim $2,500 to $5,000 Per Unit Before June 30, 2026
Section 45L pays builders and developers $500 to $5,000 per energy-efficient home, but the One Big Beautiful Bill Act ends the credit for homes acquired after June 30, 2026. A practical guide to ENERGY STAR versus Zero Energy Ready certification, prevailing wage rules on multifamily, the LIHTC basis carve-out, and the Form 8908 mechanics that decide whether the credit survives audit.
How to Read a Construction WIP Schedule: Percentage-of-Completion, Over- and Under-Billing
A construction WIP schedule recognizes revenue as work is performed using cost-to-cost percentage-of-completion, then exposes over- and under-billing on every job — the report banks and surety underwriters read before the income statement.
Job Costing for Contractors: Labor Burden, Cost Codes, and Committed Costs
Job costing assigns every dollar of cost to the job that caused it. Fully burdened labor runs 30 to 50 percent above base wage, overhead is applied with a predetermined rate, and committed costs reveal a budget overrun before the invoices arrive — read the variance column weekly.
Surviving the Workers' Comp Premium Audit: A Small Employer's Field Guide to NCCI Class Codes, Officer Elections, Overtime Carve-Outs, and Subcontractor Traps
Workers' compensation premium is recalculated every year using your actual payroll, and unprepared small employers routinely owe five-figure true-ups. This guide walks through the NCCI premium formula, the standard exception rules, the overtime carve-out math, owner and officer exclusion forms, the subcontractor COI rules that trigger the largest audit hits, and how to dispute a Final Audit Statement.
The Construction WIP Schedule: Percentage-of-Completion Accounting Under ASC 606
How construction contractors use the work-in-progress schedule and ASC 606 percentage-of-completion accounting to surface overbillings, underbillings, profit fade, and the financial signals sureties and banks actually read.
Surety Bonds for Construction Contractors: Miller Act, SBA Guarantees, and the Books That Build Bonding Capacity
How bid, performance, and payment bonds work in 2026 for small construction contractors — the Miller Act's $35K and $150K federal thresholds, the SBA's 80–90% guarantee covering contracts up to $14 million, and the working-capital and WIP discipline that decides which builders get bonded for the largest jobs.
Surety Bonds for Construction Contractors: How the Miller Act and SBA Guarantee Program Open Public Works to Small Builders
Public construction contracts above the FAR $150,000 threshold require performance and payment bonds under the Miller Act, with state Little Miller Acts setting thresholds from $25,000 to $500,000. The SBA Surety Bond Guarantee Program—which guaranteed $10.6 billion in bonds for 2,200+ small businesses in FY2025—lets approved sureties write bonds for small contractors by absorbing 80–90% of loss risk.