# Construction

Accounting practices for construction businesses including job costing, WIP schedules, and retainage

81 posts [View all tags](https://beancount.io/blog/tags) [Back to All Posts](https://beancount.io/blog)

June 3, 2026 12 min read

## [Residential Roofing and Storm Restoration Bookkeeping: A Practical Guide for Re-Roof Crews and Insurance-Claim Specialists](https://beancount.io/blog/2026/06/03/residential-roofing-storm-restoration-bookkeeping-asc-606-section-460-supplemental-claims-xactimate-anti-steering-deductible-osha-fall-protection-1099-w2-nrca-squares-per-crew-day-kpi-guide)

How residential roofers and storm restoration contractors should handle ASC 606 variable consideration, Section 460 elections, supplemental claim revenue, customer deductibles under state law, OSHA fall protection costs, and the KPIs (squares per crew-day, gross margin by channel) that separate profitable shops from busy ones.

Mike Thrift

bookkeeping construction job-costing

June 2, 2026 12 min read

## [Custom Home Builder Bookkeeping: Section 460, Job Costing, Retainage, and NAHB Benchmarks](https://beancount.io/blog/2026/06/02/residential-general-contractor-custom-home-builder-bookkeeping-section-460-percentage-of-completion-completed-contract-small-construction-exemption-job-cost-retainage-mechanics-lien-warranty-callback-nahb-kpi-guide)

How independent residential GCs and custom home builders should structure their books — Section 460 method election, phase-level job cost categories, deposit and retainage handling, mechanics lien waiver discipline, warranty reserves, and the NAHB KPIs that matter.

Mike Thrift

construction job-costing bookkeeping

June 2, 2026 13 min read

## [Solar Installer Bookkeeping: ASC 606, Section 48E ITC Adders, and Life After the Section 25D Residential Sunset](https://beancount.io/blog/2026/06/02/solar-installer-contractor-bookkeeping-asc-606-performance-obligations-section-48e-itc-2026-adders-section-25d-sunset-residential-epc-companies-domestic-content-energy-community-guide)

How residential and commercial solar EPCs should structure ASC 606 performance obligations, document the Section 48E domestic content and energy community adders, reserve for workmanship warranty per kilowatt, and survive the post-Section 25D residential market in 2026.

Mike Thrift

solar bookkeeping tax-credits

June 1, 2026 14 min read

## [Custom Cabinet and Millwork Shop Bookkeeping: ASC 606, Job Costing, and Section 179](https://beancount.io/blog/2026/06/01/custom-cabinet-architectural-millwork-shop-bookkeeping-asc-606-percentage-completion-job-costing-cnc-machine-hour-burden-hardwood-yield-loss-section-179-finishing-booth-design-deposits-throughput-linear-foot-kpi-guide)

How custom cabinet and architectural millwork shops should account for long-lead contracts under ASC 606, allocate CNC machine-hour burden, hold customer deposits as liabilities, reserve for hardwood yield loss, and expense equipment under the 2026 Section 179 limit of $2.56M.

Mike Thrift

bookkeeping manufacturing job-costing

May 23, 2026 20 min read

## [Roofing Contractor Bookkeeping for Storm Restoration: ACV, RCV, Mortgage-Endorsed Checks, Supplements, and Warranty Reserves](https://beancount.io/blog/2026/05/23/roofing-contractor-storm-restoration-insurance-claims-bookkeeping-acv-rcv-recoverable-depreciation-mortgage-endorsed-checks-supplements-aob-section-179-job-costing-workmanship-warranty-reserves-guide)

A working guide to bookkeeping for storm-restoration roofers — splitting insurance and retail revenue, tracking ACV and recoverable-depreciation receivables, modeling mortgage-endorsement float, booking supplements as scope adjustments rather than new sales, accruing 1–3 percent workmanship warranty reserves, and applying Section 179 to trucks, dumpsters, and tear-off equipment.

Mike Thrift

construction job-costing bookkeeping

May 22, 2026 12 min read

## [AIA-Style Progress Billing With Forms G702 and G703: A Contractor's Guide to Schedule of Values, Retainage, Change Orders, and ASC 606](https://beancount.io/blog/2026/05/22/aia-style-progress-billing-g702-g703-schedule-of-values-retainage-change-orders-asc-606-contractors-guide)

How AIA Forms G702 and G703 work together, how to build a defensible schedule of values, handle retainage and change orders on the continuation sheet, and reconcile progress billings to ASC 606 revenue recognition for U.S. general contractors.

Mike Thrift

construction job-costing revenue-recognition

May 19, 2026 11 min read

## [Markup vs. Margin: The Pricing Mistake That Quietly Costs Small Businesses 7 Points of Profit on Every Sale](https://beancount.io/blog/2026/05/19/markup-vs-margin-retailers-contractors-restaurants-target-gross-margin-pricing-conversion-formulas-stop-underpricing-jobs-guide)

Markup and margin share a numerator but not a denominator, and the gap can quietly cost a contractor $99,000 a year. A plain-language guide to the conversion math, a target-margin lookup table, and why retailers, contractors, and restaurants keep underpricing jobs.

Mike Thrift

pricing-strategies profit-margins small-business

May 19, 2026 16 min read

## [Solar Installation Contractor Accounting: Customer Deposits, RECs, PPAs, and Passing Through the Section 48 ITC Without Triggering Recapture](https://beancount.io/blog/2026/05/19/solar-installation-contractor-accounting-section-48-itc-section-6418-transferability-customer-deposits-recs-net-metering-ppa-asc-606-asc-842-itc-pass-through-recapture-guide)

A solar installer's bookkeeping playbook — customer deposits under ASC 606, REC inventory, PPA classification under ASC 842, the 50% basis reduction on the Section 48 ITC, Section 6418 transferability mechanics, and the five-year recapture clock that survives a sale of the business.

Mike Thrift

construction bookkeeping tax-credits

May 18, 2026 11 min read

## [Section 45L Before the Lights Go Out: How Builders and Developers Can Still Claim $2,500 to $5,000 Per Unit Before June 30, 2026](https://beancount.io/blog/2026/05/18/section-45l-new-energy-efficient-home-credit-builders-developers-2500-5000-per-unit-obbba-june-30-2026-sunset-energy-star-zero-energy-ready-prevailing-wage-form-8908-guide)

Section 45L pays builders and developers $500 to $5,000 per energy-efficient home, but the One Big Beautiful Bill Act ends the credit for homes acquired after June 30, 2026. A practical guide to ENERGY STAR versus Zero Energy Ready certification, prevailing wage rules on multifamily, the LIHTC basis carve-out, and the Form 8908 mechanics that decide whether the credit survives audit.

Mike Thrift

tax-credits tax-compliance construction

May 17, 2026 10 min read

## [How to Read a Construction WIP Schedule: Percentage-of-Completion, Over- and Under-Billing](https://beancount.io/blog/2026/05/17/construction-wip-schedule-percentage-of-completion-earned-revenue-over-under-billing-surety-bonding-guide)

A construction WIP schedule recognizes revenue as work is performed using cost-to-cost percentage-of-completion, then exposes over- and under-billing on every job — the report banks and surety underwriters read before the income statement.

Mike Thrift

construction job-costing revenue-recognition

May 17, 2026 9 min read

## [Job Costing for Contractors: Labor Burden, Cost Codes, and Committed Costs](https://beancount.io/blog/2026/05/17/job-costing-construction-trade-contractors-labor-burden-rate-committed-costs-cost-codes-job-profitability-report-guide)

Job costing assigns every dollar of cost to the job that caused it. Fully burdened labor runs 30 to 50 percent above base wage, overhead is applied with a predetermined rate, and committed costs reveal a budget overrun before the invoices arrive — read the variance column weekly.

Mike Thrift

job-costing construction trades

May 17, 2026 15 min read

## [Surviving the Workers' Comp Premium Audit: A Small Employer's Field Guide to NCCI Class Codes, Officer Elections, Overtime Carve-Outs, and Subcontractor Traps](https://beancount.io/blog/2026/05/17/workers-compensation-premium-audit-small-employers-ncci-class-codes-owner-officer-exclusion-overtime-carve-out-subcontractor-coi-true-up-guide)

Workers' compensation premium is recalculated every year using your actual payroll, and unprepared small employers routinely owe five-figure true-ups. This guide walks through the NCCI premium formula, the standard exception rules, the overtime carve-out math, owner and officer exclusion forms, the subcontractor COI rules that trigger the largest audit hits, and how to dispute a Final Audit Statement.

Mike Thrift

small-business audit payroll

[Start Free→](https://beancount.io/sign-up/?next=%2Fledger%2F) [Documentation](https://beancount.io/docs)

## Where to look next

- [Sitemap](https://beancount.io/sitemap.xml) - all pages with hreflang alternates
- [LLMs index](https://beancount.io/llms.txt) - curated links for AI agents (also /llms-full.txt for full docs)
- [Documentation](https://beancount.io/docs) - every doc is also available as text/markdown via .md suffix or Accept negotiation
- [REST API reference](https://beancount.io/docs/api-reference) - interactive endpoints, schemas, authentication, and code samples
- [OpenAPI spec](https://beancount.io/openapi.json) - OpenAPI 3.1 spec for this website's public content endpoints; the product contract for ledger operations is at https://beancount.io/api-gateway/v1/openapi.json
- [GraphQL](https://beancount.io/graphql) - public, read-only content API over the blog and research logs (no credentials, no ledger data): 12 query fields over 23 types
- [MCP server](https://beancount.io/mcp) - Model Context Protocol at https://beancount.io/api-gateway/mcp
